-
Frederic Weisbecker authored
Tune the scheduling helpers so that we can choose to schedule either pinned and/or flexible groups from a context. And while at it, refactor a bit the naming of these helpers to make these more consistent and flexible. There is no (intended) change in scheduling behaviour in this patch. Signed-off-by: Frederic Weisbecker <fweisbec@gmail.com> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Paul Mackerras <paulus@samba.org> Cc: Ingo Molnar <mingo@elte.hu> Cc: Arnaldo Carvalho de Melo <acme@infradead.org>
5b0311e1